REALIGNING THE 1/9 SOUTH FERRY SUBWAY TERMINAL
Client
The Battery Park Conservancy
Team
Michael Fishman (Principal) Sam Schwartz, Engineering
Urban Question
How can the Park minimize impacts of construction (including loss of ½ the Park’s historic trees and years of compromised open space) for the new 1/9 subway station?
Urban Answer
Saving the only playground in the area and most of the historic trees maximizes open space for the Park during construction by shifting the terminal alignment out of the Park as soon as possible. By reconsidering the issue, the MTA got a better entrance and connection to the N/R train, the project was sped up for working adjacent to and not within the Park.